Skip to main content

Engineering changes

A change number determines from which day BOM and routing revisions become valid. If a number is selected when a revision is published, the revision is valid from the number's valid-from date; until that day the previous revision remains effective. MRP explodes a planned order with the BOM valid on its start date.

A change request (numbered DTL-) records the reason for the change, its impact and the objects it affects; when approved, it opens the change number itself.

Screen
Module
Manufacturing
Menu path
Üretim › Ana Veriler › Mühendislik Değişiklikleri · Değişiklik Talepleri (Production › Master Data › Engineering Changes · Change Requests)
Screen route
/erp/manufacturing/engineering-changes
Required permission
erp-manufacturing-engineering-changes.view (görme) · .create (değişiklik numarası ve talep açma) · .edit (değiştirme, kilitleme)

Engineering Changes list​

Engineering Changes list
  1. 1New change number
  2. 2Valid-from date of the number
  3. 3Revisions released with it
  4. 4Active or Locked
ColumnMeaning
Değişiklik No (Change No.)MDN-yyyy-nnnnnn; assigned on save.
Başlık (Title)Short name of the change.
Geçerlilik (Validity)The first day on which revisions published with the number are valid.
Revizyon (Revisions)The number of revisions published with this number.
Durum (Status)Etkin (Active) or Kilitli (Locked).
Oluşturan (Created By)The user who opened the number.

The Değişiklik Numarası Oluştur (Create Change Number) form: Başlık (Title), Değişiklik nedeni (Reason for change) (both required), Geçerlilik başlangıcı (Valid from; required). Details: Create an engineering change.

Statuses and actions​

StatusMeaningActions (in the details)
Etkin (Active)Can be selected in the publish window.Değiştir (Change; title, reason, date), Kilitle (Lock).
Kilitli (Locked)Cannot be selected when publishing a new revision; releases already made with this number remain valid.Değiştir (Change), Kilidi Kaldır (Unlock).

The details page shows Durum (Status), Başlık (Title), Geçerlilik başlangıcı (Valid from; Yürürlükte (In effect) if it has taken effect), Oluşturan (Created By), Değişiklik nedeni (Reason for change) and Nesne Listesi — Ürün Ağacı Revizyonları (Object List — BOM Revisions; the revisions published with this number).

Rules for changing the validity date:

  • If the number has taken effect and is in use, the date cannot be changed; open a new change number.
  • Moving the date also moves the revisions published with the number; it cannot be moved into the past.
  • Validity follows the revision sequence: a revision cannot become valid earlier than the previous revision or later than the next revision.

Change Requests​

Change Requests list
  1. 1New change request
  2. 2Draft, Pending Approval, Approved…
  3. 3Number opened on approval
ColumnMeaning
Talep (Request)DTL-yyyy-nnnnnn.
Başlık, Durum (Title, Status)The request's name and status.
Önerilen Geçerlilik (Proposed Validity)The day proposed by the requester; on approval it becomes the validity of the number opened.
Değişiklik No (Change No.)The MDN- number opened on approval.
Nesne (Objects)Number of affected objects.
Açan (Opened By)The user who opened the request.

The Değişiklik Talebi Aç (Open Change Request) form: Başlık (Title), Neden (Reason; required), Etki notu (Impact note; cost, stock, open orders…), Önerilen geçerlilik (Proposed validity; required) and Etkilenen Nesneler (Affected Objects) — select the object type (Ürün ağacı (BOM), Rota (Routing), Ürün (Product)) and add a record with Nesne ekle (Add object); at least one object is required. Taslağı Kaydet (Save Draft) saves the request as Taslak (Draft).

Draft change request
  1. 1Submit — for approval or approved directly
  2. 2Edit — draft only
  3. 3Cancel
  4. 4Change number is opened on approval

Request statuses​

StatusActions
Taslak (Draft)Düzenle (Edit), Gönder (Submit), İptal Et (Cancel).
Onay Bekliyor (Pending Approval)Approver: Onayla (Approve) or Reddet (Reject; rejection reason required; the request returns to Taslak (Draft)). İptal Et (Cancel).
Onaylandı (Approved)No actions; the MDN- number opened is shown in the Değişiklik numarası (Change number) field.
İptal (Cancelled)No actions.
  • Gönder (Submit): if an approval template for change requests is defined in the setup, the request becomes Onay Bekliyor (Pending Approval); if not, it becomes Onaylandı (Approved) directly and the change number is opened immediately (in the demo environment DTL-2026-000001 → MDN-2026-000002).
  • You cannot approve a request you opened yourself; another approver makes the decision.
  • An approved or cancelled request cannot be cancelled.

Effect on revision release​

  • The Değişiklik numarası (Change number) selector in the publish windows of the BOM, routing and component management screens lists only Etkin (Active) numbers; leaving it blank means "valid from today".
  • If an approved request is required in Üretim Ayarları (Production Settings), a revision can be published only with a number opened from an approved request.

Common messages​

MessageEnglish meaningCause
MDN-… kilitli — yeni yayında kullanılamaz.MDN-… is locked — it cannot be used for a new release.A locked number was selected; use Kilidi Kaldır (Unlock) or another number.
Revizyon yalnız onaylı bir değişiklik talebinin numarasıyla yayınlanır (Üretim Ayarları) — talep açıp onaylatın.A revision can be published only with the number of an approved change request (Production Settings) — open a request and have it approved.The setting is on and no number was selected.
MDN-… onaylı bir değişiklik talebinden açılmadı — yayın için onaylı talebin numarası gerekir.MDN-… was not opened from an approved change request — releasing requires the number of an approved request.The setting is on and the number was opened manually.
MDN-… gg.aa.yyyy tarihinde yürürlüğe girdi — geçerlilik tarihi değiştirilemez; yeni bir değişiklik numarası açın.MDN-… took effect on dd.mm.yyyy — the validity date cannot be changed; open a new change number.An attempt was made to change the date of a number in effect.
Kullanımdaki değişikliğin geçerliliği geçmişe alınamaz.The validity of a change in use cannot be moved into the past.The date was moved into the past.
Revizyon N gg.aa.yyyy tarihinden geçerli olamaz — önceki revizyon M gg.aa.yyyy tarihinden geçerli; geçerlilik revizyon sırasıyla ilerler.Revision N cannot be valid from dd.mm.yyyy — the previous revision M is valid from dd.mm.yyyy; validity follows the revision sequence.The number's date is earlier than the previous revision.
Talep en az bir etkilenen nesne (ürün ağacı, rota ya da ürün) taşır.A request must have at least one affected object (BOM, routing or product).No object was added.
Kendi açtığınız değişiklik talebini onaylayamazsınız. Kararı başka bir onaycı vermeli.You cannot approve a change request you opened yourself. Another approver must make the decision.Self-approval was attempted.
Red gerekçesi zorunludur.A rejection reason is required.Rejection without a reason.
DTL-… taslak değil — değiştirilemez.DTL-… is not a draft — it cannot be changed.An attempt was made to edit a submitted request.