Create a production order
Module
Manufacturing
Menu path
Üretim › Üretim Yürütme › Üretim Emri Oluştur (Production › Production Execution › Create Production Order)
Screen route
/erp/manufacturing/orders/newRequired permission
erp-manufacturing-orders.createPrerequisites
- The Üretilir (Produced) flag of the card to be produced is on, the card is active and it is not a service card.
- The card has a released BOM revision with production usage whose validity has started.
- For a configurable item, the order is opened from a sales order — Open a production order from a sales order.
A production order states with which BOM revision and in what quantity an item is to be produced. The order is opened as a draft; in draft, the quantity, revision and work center can be edited.
Steps
- Open the Üretim › Üretim Yürütme › Üretim Emri Oluştur (Production › Production Execution › Create Production Order) screen. If you are in the list, click Yeni Üretim Emri (New Production Order).
- Type the code or name of the output card in the Ürün ağacı ara (Search BOM) box; select the BOM (with its alternative and revision) from the list.
- Click the PASLANMAZ ÇALIŞMA TEZGAHI 150X70 · Rev 1 card in the list.
- Enter the Planlanan Miktar (Planned Quantity) in the output unit. The unit comes from the revision and cannot be changed; the decimal limit is shown under the field.
- If you wish, select the İş Merkezi (Work Center) (the station for which the order is planned; where the work is actually done is recorded separately on consumption and output).
- Click Üretim Emrini Kaydet (Save Production Order).
New Production Order — BOM and quantity chosen - 1Search BOM — released revisions only
- 2Plan source: BOM and revision
- 3Planned Quantity — unit from the revision
- 4Work center — optional
- 5Save — order is created as Draft
Result
The order is saved with the number UE-yyyy-nnnnnn in Taslak (Draft) status. There is no stock movement or material reservation; the requirements are created on release. Next step: Release the production order.
What you need to know
- The list shows only the released revisions, whose validity has started, of BOMs with production usage; older released revisions can also be selected. If the card has several alternatives, the lot-size range is shown next to them. No order can be opened from an engineering BOM.
- If the quantity produces a fraction in a piece-based component, the order cannot be released (no silent rounding). Example: the BOM of MAM-0008 has 25 cartons for 100 ADET (pcs); 50 ADET makes 12.5 cartons, and on release the message "… 'ADET' biriminin 0 ondalık basamak sınırını aşıyor" (… exceeds the 0 decimal place limit of the 'ADET' unit) appears. Set the quantity to a suitable multiple of the BOM's base quantity.
- For a serial-managed output, the planned quantity must be an integer.
- In draft, Düzenle (Edit: quantity, revision, work center), Böl (Split), Tarihleri Planla (Schedule Dates), Malzeme Talebi (Material Requisition) and İptal Et (Cancel) are available. When you leave an unsaved form, the system asks you.
- Ağaçsız Emir (Order without BOM) (the button in the list): an order for a card without a BOM in which you enter the components manually. The component list can be left empty, but an empty order cannot be released; when the quantity changes, the components are not scaled.
- If you are coming from planning, the order is converted from a planned order: Convert a planned order.
Common messages
| Message | English meaning | Cause |
|---|---|---|
| Planlanan miktar zorunlu. | The planned quantity is required. | The quantity is empty (form validation). |
| Planlanan üretim miktarı sıfırdan büyük olmalıdır. | The planned production quantity must be greater than zero. | The quantity is 0 or negative. |
| 'KART' üretilen kart olarak işaretlenmemiş — üretim emri açılamaz. Kartın 'Üretilir' bayrağını açın. | 'KART' is not flagged as a produced card — a production order cannot be opened. Turn on the card's 'Üretilir' flag. | Üretilir (Produced) is off on the card. |
| 'KART' pasif — pasif stok kartı için üretim emri açılamaz. | 'KART' is inactive — a production order cannot be opened for an inactive stock card. | The card is inactive. |
| Mühendislik ağacından üretim emri açılamaz — üretim kullanımındaki bir ağaç seçin. | A production order cannot be opened from an engineering BOM — select a BOM with production usage. | Wrong usage. |
| Üretim emri yalnız yayınlanmış ürün ağacı revizyonu üzerinden oluşturulabilir. | A production order can be created only from a released BOM revision. | The revision is a draft. |
| Revizyon {n} {tarih} tarihinden itibaren geçerli — bugün emre verilemez. | Revision {n} is valid from {tarih} — it cannot be used for an order today. | Validity is in the future. |
| 'MAM-0001' yapılandırılabilir kart — üretim emri yalnız yapılandırılmış bir satış siparişi satırından açılır. | 'MAM-0001' is a configurable card — a production order can be opened only from a configured sales order line. | A configurable item was selected manually; open the order from the sales order. |