Work centers
A work center states where production takes place: a line, a workshop, an assembly bench or a machine group. Routing operations are assigned to a work center; the work center's capacity is the calendar of the production plan and of the capacity load. A work center is not deleted; to take it out of use, deactivate it — past orders are not affected.
Screen/erp/manufacturing/work-centerserp-manufacturing-work-centers.view (görme) · .create (yeni iş merkezi, alt iş merkezi) · .edit (düzenleme, kapasite, tezgâh) · .import (İçe Aktar)List
- 1New work center
- 2Tree / list view
- 3Daily capacity (minutes)
- 4Click the code to open the card
| Column | Meaning |
|---|---|
| Kod, Ad (Code, Name) | The code is uppercase and unique. Clicking the code opens the record. |
| Tür (Type) | Makine (Machine), İşçilik (Labor) or Diğer (Other). |
| Açıklama, Sorumlu, Sıra (Description, Responsible, Sequence) | Free description, the person the work is assigned to, position in the list. |
| Günlük kapasite (Daily capacity) | In minutes and hours (e.g. "480 dk (8 sa)" — 480 min (8 h)), with working days below; if no capacity is defined, Tanımsız (Not defined). |
| Durum (Status) | Aktif (Active) or Pasif (Inactive). |
The Ağaç / Liste (Tree / List) buttons switch between hierarchical and flat views. Filters: Ara (Search), Tür (Type), Durum (Status), Üst iş merkezi (Parent work center). Dışa Aktar / İçe Aktar (Export / Import) transfer records in bulk with an Excel workbook. Editing is done from the row's İşlemler (Actions) menu.
New Work Center window
- 1Code — suggested from name, unique
- 2Type — Machine, Labour, Other
- 3Supply warehouse — issues from here
- 4Capacity defined
- 5(Shift − break) × utilisation × units
- 6Create
| Field | Rule |
|---|---|
| Ad (Name; required) | The name of the work center. |
| Kod (Code; required) | Proposed from the name; can be overwritten. Converted to uppercase; must be unique. |
| Tür (Type) | Makine (Machine), İşçilik (Labor), Diğer (Other) (default for a new record: Makine). |
| Üst iş merkezi (Parent work center) | For grouping (e.g. machines under Talaşlı İmalat (Machining)): load is rolled up, and filters and responsibility cover the child work centers. Capacity and rates are not inherited. A loop cannot be created; a work center cannot be placed under an inactive work center. |
| Tesis (Plant) | The factory calendar (public holidays, half days, special working days) is read from the plant; the production plan and capacity load skip holidays. |
| Besleme deposu (Supply warehouse) | The material of the production order is staged in this warehouse (Malzeme Hazırla, Stage Material); consumption is posted from here. Must be an active warehouse. |
| Sorumlu (Responsible) | States who the work is assigned to (failed backflush, confirmation, capacity); it does not grant permissions. |
| Açıklama, Sıra (Description, Sequence) | The sequence is zero or a positive integer. |
| Aktif (Active) | If off, the work center cannot be selected for new documents and routings. |
| Kapasite tanımlı (Capacity defined) | If off, planning assumes 8-hour weekdays for this work center and no available time is shown in the load. |
When Kapasite tanımlı (Capacity defined) is turned on:
| Field | Rule |
|---|---|
| Vardiya (Shift) | Start – end time. If the end is before the start, the shift spans midnight. |
| Mola (dk) (Break, min) | Must be shorter than the shift duration. |
| Kullanım oranı (%) (Utilization rate, %) | Greater than 0, at most 100, at most two decimals. |
| Bireysel kapasite (Individual capacity) | Number of machines or people working in parallel. If individual capacities are defined below, it is derived from the number of active ones. |
| Çalışma günleri (Working days) | Pzt … Paz (Mon … Sun); at least one day must be selected. |
| Günlük kapasite (Daily capacity) | (Shift − break) × utilization × individual capacity — the exact value comes from the server after saving. |
Bireysel Kapasiteler (Individual Capacities): identical machines or benches (CNC-1, CNC-2). Bireysel Kapasite Ekle (Add Individual Capacity) lets you enter a name, code and sequence; the code is unique within the work center. There is no delete — deactivate an unused unit. The number of active units is the capacity count; the shift and rate belong to the work center.
Work center record
- 1Hourly rates (cost estimate)
- 2Shift, break, utilisation
- 3Machine — individual capacity
- 4Work center load
- 5Child work center
| Section | Content |
|---|---|
| Genel Bilgiler (General Information) | Tür (Type), Üst iş merkezi (Parent work center), Sorumlu (Responsible), Sıra (Sequence), Açıklama (Description). |
| Kapasite (Capacity) | Vardiya (Shift), Mola (Break), Kullanım (Utilization), Kapasite sayısı (Capacity count), Çalışma günleri (Working days), Günlük kapasite (Daily capacity). If not defined, a Kapasite Tanımla (Define Capacity) button. |
| Tezgâhlar (Machines) | The work center's individual capacities; Tezgâh Ekle (Add Machine). |
| Ekipmanlar (Equipment) | Linked maintenance equipment (Ekipman (Equipment), Ad (Name), Tür (Type), Tezgâh (Machine), Seri No (Serial No.), Garanti (Warranty), Durum (Status)); Ekipman Ekle (Add Equipment). |
| Alt İş Merkezleri (Child Work Centers) | Child work centers; Alt İş Merkezi Ekle (Add Child Work Center). |
Links in the header: Operasyonlar (Operations; the work center's work list) and Kapasite Yükü (Capacity Load). Düzenle (Edit) opens the same window in edit mode.
Activity rates
Faaliyet Tarifeleri (Activity Rates; with the cost view permission) holds the work center's hourly rates with dates: Geçerlilik başlangıcı (Valid from), Para birimi (Currency), Hazırlık saat ücreti (Setup hourly rate), Makine saat ücreti (Machine hourly rate), İşçilik saat ücreti (Labor hourly rate), Genel gider (%) (Overhead, %). The rates are used by the cost estimate; for an operation on a work center without a rate, the estimate total stays blank.
Common messages
| Message | English meaning | Cause |
|---|---|---|
| '…' kodlu iş merkezi zaten mevcut. | A work center with code '…' already exists. | The code is in use. |
| '…' iş merkezi pasif — yeni belgeye seçilemez. | Work center '…' is inactive — it cannot be selected for a new document. | An inactive work center was selected. |
| '…' bu iş merkezinin altında — döngü kurulamaz. | '…' is below this work center — a loop cannot be created. | The parent work center was selected from among its own children. |
| Mola vardiya süresinden kısa olmalı. | The break must be shorter than the shift duration. | Break ≥ shift. |
| Kapasite kullanım oranı 0'dan büyük, en çok 100 ve en çok 2 ondalık olmalı. | The capacity utilization rate must be greater than 0, at most 100 and have at most 2 decimals. | Invalid rate. |
| En az bir çalışma günü seçin. | Select at least one working day. | No day is ticked. |
| '…' bireysel kapasitesi listede yok — bireysel kapasite silinmez, pasife alın. | Individual capacity '…' is not in the list — individual capacities are not deleted; deactivate it. | An attempt was made to remove a row. |
| Besleme deposu aktif bir depo olmalı. | The supply warehouse must be an active warehouse. | An inactive warehouse was selected. |