Skip to main content

Work centers

A work center states where production takes place: a line, a workshop, an assembly bench or a machine group. Routing operations are assigned to a work center; the work center's capacity is the calendar of the production plan and of the capacity load. A work center is not deleted; to take it out of use, deactivate it — past orders are not affected.

Screen
Module
Manufacturing
Menu path
Üretim › Ana Veriler › İş Merkezleri (Production › Master Data › Work Centers)
Screen route
/erp/manufacturing/work-centers
Required permission
erp-manufacturing-work-centers.view (görme) · .create (yeni iş merkezi, alt iş merkezi) · .edit (düzenleme, kapasite, tezgâh) · .import (İçe Aktar)

List​

Work Centers list
  1. 1New work center
  2. 2Tree / list view
  3. 3Daily capacity (minutes)
  4. 4Click the code to open the card
ColumnMeaning
Kod, Ad (Code, Name)The code is uppercase and unique. Clicking the code opens the record.
Tür (Type)Makine (Machine), İşçilik (Labor) or Diğer (Other).
Açıklama, Sorumlu, Sıra (Description, Responsible, Sequence)Free description, the person the work is assigned to, position in the list.
Günlük kapasite (Daily capacity)In minutes and hours (e.g. "480 dk (8 sa)" — 480 min (8 h)), with working days below; if no capacity is defined, Tanımsız (Not defined).
Durum (Status)Aktif (Active) or Pasif (Inactive).

The Ağaç / Liste (Tree / List) buttons switch between hierarchical and flat views. Filters: Ara (Search), Tür (Type), Durum (Status), Üst iş merkezi (Parent work center). Dışa Aktar / İçe Aktar (Export / Import) transfer records in bulk with an Excel workbook. Editing is done from the row's İşlemler (Actions) menu.

New Work Center window​

New Work Center dialog — with capacity
  1. 1Code — suggested from name, unique
  2. 2Type — Machine, Labour, Other
  3. 3Supply warehouse — issues from here
  4. 4Capacity defined
  5. 5(Shift − break) × utilisation × units
  6. 6Create
FieldRule
Ad (Name; required)The name of the work center.
Kod (Code; required)Proposed from the name; can be overwritten. Converted to uppercase; must be unique.
Tür (Type)Makine (Machine), İşçilik (Labor), Diğer (Other) (default for a new record: Makine).
Üst iş merkezi (Parent work center)For grouping (e.g. machines under Talaşlı İmalat (Machining)): load is rolled up, and filters and responsibility cover the child work centers. Capacity and rates are not inherited. A loop cannot be created; a work center cannot be placed under an inactive work center.
Tesis (Plant)The factory calendar (public holidays, half days, special working days) is read from the plant; the production plan and capacity load skip holidays.
Besleme deposu (Supply warehouse)The material of the production order is staged in this warehouse (Malzeme Hazırla, Stage Material); consumption is posted from here. Must be an active warehouse.
Sorumlu (Responsible)States who the work is assigned to (failed backflush, confirmation, capacity); it does not grant permissions.
Açıklama, Sıra (Description, Sequence)The sequence is zero or a positive integer.
Aktif (Active)If off, the work center cannot be selected for new documents and routings.
Kapasite tanımlı (Capacity defined)If off, planning assumes 8-hour weekdays for this work center and no available time is shown in the load.

When Kapasite tanımlı (Capacity defined) is turned on:

FieldRule
Vardiya (Shift)Start – end time. If the end is before the start, the shift spans midnight.
Mola (dk) (Break, min)Must be shorter than the shift duration.
Kullanım oranı (%) (Utilization rate, %)Greater than 0, at most 100, at most two decimals.
Bireysel kapasite (Individual capacity)Number of machines or people working in parallel. If individual capacities are defined below, it is derived from the number of active ones.
Çalışma günleri (Working days)Pzt … Paz (Mon … Sun); at least one day must be selected.
Günlük kapasite (Daily capacity)(Shift − break) × utilization × individual capacity — the exact value comes from the server after saving.

Bireysel Kapasiteler (Individual Capacities): identical machines or benches (CNC-1, CNC-2). Bireysel Kapasite Ekle (Add Individual Capacity) lets you enter a name, code and sequence; the code is unique within the work center. There is no delete — deactivate an unused unit. The number of active units is the capacity count; the shift and rate belong to the work center.

Work center record​

Work center card
  1. 1Hourly rates (cost estimate)
  2. 2Shift, break, utilisation
  3. 3Machine — individual capacity
  4. 4Work center load
  5. 5Child work center
SectionContent
Genel Bilgiler (General Information)Tür (Type), Üst iş merkezi (Parent work center), Sorumlu (Responsible), Sıra (Sequence), Açıklama (Description).
Kapasite (Capacity)Vardiya (Shift), Mola (Break), Kullanım (Utilization), Kapasite sayısı (Capacity count), Çalışma günleri (Working days), Günlük kapasite (Daily capacity). If not defined, a Kapasite Tanımla (Define Capacity) button.
Tezgâhlar (Machines)The work center's individual capacities; Tezgâh Ekle (Add Machine).
Ekipmanlar (Equipment)Linked maintenance equipment (Ekipman (Equipment), Ad (Name), Tür (Type), Tezgâh (Machine), Seri No (Serial No.), Garanti (Warranty), Durum (Status)); Ekipman Ekle (Add Equipment).
Alt İş Merkezleri (Child Work Centers)Child work centers; Alt İş Merkezi Ekle (Add Child Work Center).

Links in the header: Operasyonlar (Operations; the work center's work list) and Kapasite Yükü (Capacity Load). Düzenle (Edit) opens the same window in edit mode.

Activity rates​

Faaliyet Tarifeleri (Activity Rates; with the cost view permission) holds the work center's hourly rates with dates: Geçerlilik başlangıcı (Valid from), Para birimi (Currency), Hazırlık saat ücreti (Setup hourly rate), Makine saat ücreti (Machine hourly rate), İşçilik saat ücreti (Labor hourly rate), Genel gider (%) (Overhead, %). The rates are used by the cost estimate; for an operation on a work center without a rate, the estimate total stays blank.

Common messages​

MessageEnglish meaningCause
'…' kodlu iş merkezi zaten mevcut.A work center with code '…' already exists.The code is in use.
'…' iş merkezi pasif — yeni belgeye seçilemez.Work center '…' is inactive — it cannot be selected for a new document.An inactive work center was selected.
'…' bu iş merkezinin altında — döngü kurulamaz.'…' is below this work center — a loop cannot be created.The parent work center was selected from among its own children.
Mola vardiya süresinden kısa olmalı.The break must be shorter than the shift duration.Break ≥ shift.
Kapasite kullanım oranı 0'dan büyük, en çok 100 ve en çok 2 ondalık olmalı.The capacity utilization rate must be greater than 0, at most 100 and have at most 2 decimals.Invalid rate.
En az bir çalışma günü seçin.Select at least one working day.No day is ticked.
'…' bireysel kapasitesi listede yok — bireysel kapasite silinmez, pasife alın.Individual capacity '…' is not in the list — individual capacities are not deleted; deactivate it.An attempt was made to remove a row.
Besleme deposu aktif bir depo olmalı.The supply warehouse must be an active warehouse.An inactive warehouse was selected.