Create a kanban control cycle
Module
Manufacturing
Menu path
Üretim › Kanban › Kanban Kontrol Döngüleri › Kontrol Döngüsü Oluştur (Production › Kanban › Kanban Control Cycles › Create Control Cycle)
Screen route
/erp/manufacturing/kanban/control-cyclesRequired permission
erp-manufacturing-kanban.createPrerequisites
- The item is a concrete stock card (not a configurable parent card).
- For in-house production the card has a released production BOM; for external procurement it has the purchasable flag.
- There is no other control cycle for this item in the same warehouse.
Kanban replenishes a continuously consumed item container by container, without the need for MRP planning. The number of containers and the container quantity are chosen so that they cover consumption during the replenishment lead time.
Steps
- Open the Üretim › Kanban › Kanban Kontrol Döngüleri (Production › Kanban › Kanban Control Cycles) screen and click Kontrol Döngüsü Oluştur (Create Control Cycle).
Kanban Control Cycles list - 1Create Control Cycle
- 2In-house · External · Stock transfer
- 3Container status summary
- Click the Ürün (Item) field, type the code and select the card. Next to the card, Üretilir / Satın alınır (Produced / Purchased) is shown.
- Select the Tedarik deposu (Supply warehouse) — the warehouse where the containers are kept and where replenishment arrives.
- Select the İkmal stratejisi (Replenishment strategy): İç üretim (In-house production), Dış tedarik (External procurement) or Stok transferi (Stock transfer). For stock transfer, the Kaynak depo (Source warehouse) is also selected.
- Enter the Kap miktarı (Container quantity, in the base unit) and Kap sayısı (Number of containers, 1–99).
Create Kanban Control Cycle dialog - 1Product — concrete stock item
- 2Supply warehouse — where containers sit
- 3Replenishment strategy
- 4Quantity per container — base unit
- 5Number of containers — 1–99
- Click Oluştur (Create).
- On the Kanban Panosu (Kanban Board), press Boş Bildir (Report Empty) in the tile when a container is emptied; when the goods arrive, press Dolu İşaretle (Mark Full).
Kanban Board — container statuses - 1Control cycle
- 2Container in replenishment and its document
- 3Set In Use
- 4Signal Empty — opens replenishment
- 5Mark Full — when goods arrive
Result
The control cycle is set up as active and its containers appear on the board in Dolu (Full) status. Depending on the strategy, each empty signal opens a draft production order, a draft purchase requisition or a transfer reservation; complete the document on the relevant screen.
What you need to know
- The document opened is a draft: sending the purchase requisition or releasing the production order is done on the relevant screen.
- If the empty signal is repeated, a second document is not opened; if the container is already in replenishment, the server says "Kap N zaten ikmalde (…)." (Container N is already in replenishment (…).)
- Setting the cycle to inactive stops new empty signals; a container in replenishment can still be marked full.
- The strategy and the source warehouse cannot be changed while a container is in replenishment; the number of containers can only be reduced by removing full containers from the end.