Open a BOM revision
Module
Manufacturing
Menu path
Üretim › Ana Veriler › Ürün Ağaçları › ağaç detayı › Yeni Revizyon (Production › Master Data › Bills of Materials › BOM detail › New Revision)
Screen route
/erp/manufacturing/boms/{id}/revisions/newRequired permission
erp-manufacturing-boms.editPrerequisites
- The BOM has no open draft revision (if it does, release or edit that one first).
A released revision cannot be changed or deleted. A change is made with a new draft revision, which replaces the previous revision when it is released (or on the date of the selected change number).
Steps
- In the Üretim › Ana Veriler › Ürün Ağaçları (Production › Master Data › Bills of Materials) list, click the output card to open the BOM detail.
- Click Yeni Revizyon (New Revision) in the header. The button is visible only when the BOM has no draft.
Released production BOM — new revision - 1New Revision — only when no draft exists
- 2Multi-level explosion
- 3Revision status
- Enter the Temel Miktar (Base Quantity). The form opens empty: nothing is copied from the previous revision.
New Revision form - 1Output item is locked
- 2Base quantity — entered again
- 3Lines are entered from scratch
- 4Create Revision — draft
- Enter the lines with Malzeme Ekle (Add Material) or Boş Satır (Empty Line); on each line, set the Miktar (Quantity), Birim (Unit), Bileşen firesi (%) (Component scrap, %) and Geri sarf (Backflush).
- Click Revizyonu Oluştur (Create Revision).
Draft revision — edit and release - 1Edit — draft only
- 2Release
- 3Component scrap
- 4Backflushed line
Result
The new revision is saved as Taslak (Draft); the released revision remains effective as it is. Change the draft with Düzenle (Edit) and release it. In the demo environment, the Revision 2 draft for BOM #49 was opened with these steps.
What you need to know
- A BOM can have only one draft at a time. While there is a draft, Yeni Revizyon (New Revision) is not visible; the server also rejects it with "Bu ürün ağacında zaten düzenlenebilir bir taslak revizyon var. Önce mevcut taslağı yayınlayın ya da güncelleyin." (This BOM already has an editable draft revision. Release or update the existing draft first.)
- In the BOM form, a new revision opens empty; enter the unchanged lines again as well. To change a component in many BOMs at the same time, BOM component management opens a new revision by copying the latest released revision.
- If the Base Quantity is left empty, the Revizyon kaydedilemedi (Revision could not be saved) summary says "Temel çıktı miktarı zorunlu." (The base output quantity is required.)
- Decimal quantities are entered in Turkish format (with a comma):
4,2. - The output card does not change in a new revision; for a different card, a new BOM is opened.
- A new revision is different for a routing: it opens prefilled with the operations of the highest-numbered revision (Routings).