Enter an operation confirmation
Module
Manufacturing
Menu path
Üretim › Üretim Yürütme › Operasyon Teyidi Gir (Production › Production Execution › Enter Operation Confirmation)
Screen route
/erp/manufacturing/confirmations/new?emir={id}Required permission
erp-manufacturing-postings.createPrerequisites
- The order is Yayınlandı (Released) or Üretimde (In Production) and has operations (item with a routing).
- The operation has not received its final confirmation.
A confirmation is the shop floor's report that "this much work came out of this operation, and it took this long". Capacity load, labor and scrap reports and OEE are fed by confirmations.
Steps
- Click Teyit Gir (Enter Confirmation) on the order detail, or Teyit Gir on the row in the Üretim Operasyonları (Production Operations) worklist.
- Select the operation to be confirmed from the table (the first open operation is preselected). An operation with a final confirmation cannot be selected.
- Check the Teyit tarihi (Confirmation date). Enter the Sağlam (Yield) quantity or click Kalanı yaz (Enter remaining); enter the Fire (Scrap) quantity, if any.
Enter Operation Confirmation - 1Pick the operation — remaining = planned − (yield + scrap)
- 2Yield quantity
- 3Fill remaining
- 4Scrap quantity
- 5Actual times — server proposes when empty
- 6Save Confirmation — no stock posting
- Enter the Hazırlık (dk) (Setup, min), Makine (dk) (Machine, min) and İşçilik (dk) (Labor, min) times. If you leave them empty, the server proposes them from the planned values (grey text is a preview).
- If necessary, select the employees with Çalışan ekle (Add employee). If the operation finishes with this confirmation, check the Son teyit — operasyon kapanır (Final confirmation — operation closes) box.
- Click Teyidi Kaydet (Save Confirmation).
Result
The confirmation is saved with the number TYD-yyyy-nnnnnn; the operation's yield/scrap total and actual time increase. If this is the first physical posting, the order becomes Üretimde (In Production). A confirmation does not post stock — to put the finished product into stock, record the production output.
What you need to know
- Partial confirmation is allowed: several confirmations can be entered for the same operation during the day; the total Sağlam / fire (Yield / scrap) and Kalan (Remaining) are updated and the status becomes Kısmi teyit (Partially confirmed). When Son teyit (Final confirmation) is checked, the status becomes Son teyit and the operation drops off the worklist.
- Proposed times: setup is the planned setup time on the operation's first confirmation; machine and labor are proportional to the confirmed quantity relative to the planned quantity. Example: on UE-2026-000001, the plan for operation 10 is setup 15, machine 60, labor 15 min (3 ADET (pcs)); the actual time of the confirmation entered with 15 + 55 + 16 min was 86 min.
- A confirmation does not enforce the operation sequence; however, if an operation's in-process inspection is awaiting a decision, the next operation cannot be confirmed.
- A quantity posted to rework does not count as yield; a final confirmation cannot be given before the rework is finished.
- Cancelling a confirmation: İptal Et (Cancel) on the row in the Operation confirmations list (a reason is mandatory). If a final confirmation is cancelled, the operation is reopened.
- The yield confirmation of the last operation appears as a proposal on the output form (Öneriyi Uygula (Apply Proposal)); the confirmation does not post the output by itself.
Common messages
| Message | English meaning | Cause |
|---|---|---|
| Teyit edilecek operasyonu seçin. | Select the operation to be confirmed. | No row was selected. |
| Teyit ileri tarihli olamaz. | A confirmation cannot be future-dated. | The date is after today. |
| Teyit boş olamaz — miktar ya da süre girin. | A confirmation cannot be empty — enter a quantity or a time. | All fields are empty. |
| Yalnız Yayınlandı ya da Üretimde durumundaki üretim emrine operasyon teyidi girilebilir. | Operation confirmations can be entered only for a production order in Released or In Production status. | The order is not in an eligible status. |
| Çalışanların süreleri toplamı işçilik süresine eşit olmalı. | The sum of the employees' times must equal the labor time. | The times do not add up. |
| Üretim emri bu arada değişti — bağlamı yenileyip yeniden deneyin. | The production order changed in the meantime — refresh the context and try again. | Concurrent posting; use Bağlamı yenile (Refresh context). |