# Production operations

> The shop floor's work list — operations of open orders without a final confirmation, per work center and machine; confirm from the row.

URL: https://erpdocs.corexlogic.com/en/uretim/ekranlar/uretim-operasyonlari

This is the shop floor's daily work list: every operation of released and in-production orders that **has not
received its final confirmation** is a row. The supervisor filters by their own work center, sees the next job and
enters a confirmation from the row.

- **Type:** Screen
- **Module:** Manufacturing
- **Menu path:** Üretim › Üretim Yürütme › Üretim Operasyonları (Production › Production Execution › Production Operations)
- **Screen route:** `/erp/manufacturing/operations`
- **Required permission:** `erp-manufacturing-orders.view (liste)`, `erp-manufacturing-postings.create (Teyit Gir)`

![Production Operations — work list](https://erpdocs.corexlogic.com/en/en/img/screens/uretim/operasyon-listesi.png)
1. Work center filter
2. Only my work centers
3. Remaining quantity
4. Enter Confirmation — opens for this operation

## Columns

| Column | Meaning |
|---|---|
| **Üretim emri** (Production order) | The order number (link to the order details). |
| **Operasyon** (Operation) | Operation number and description (from the routing: 10 Sac ve boru kesim (sheet and tube cutting), 20 Büküm (bending)…). |
| **İş merkezi** (Work center) | The operation's work center. |
| **Tezgâh** (Machine) | The planned individual capacity (machine); blank if no machines are defined for the work center. |
| **Planlanan** (Planned) | The planned quantity of the operation (the order quantity). |
| **Sağlam / fire** (Good / scrap) | Good and scrap quantities confirmed so far. |
| **Kalan** (Remaining) | Planned − (good + scrap). |
| **Durum** (Status) | **Başlamadı** (Not started), **Kısmi teyit** (Partially confirmed) or **Son teyit** (Final confirmation). |

**Teyit Gir** (Enter Confirmation) on the row opens the [Enter Operation Confirmation](https://erpdocs.corexlogic.com/en/uretim/islemler/operasyon-teyidi-girme)
form with the order and operation preselected. An operation that receives its final confirmation drops off the list.

## Filters

- **Ara** (Search) — order number, product or operation text.
- **İş Merkezi** (Work Center) — in work center hierarchy order; selecting a parent work center also brings its child
  work centers. When the work center changes, the machine filter is reset.
- **Tezgâh** (Machine) — visible only in a setup with machines defined.
- **Başlangıç** · **Bitiş** (Start · End) — the period that overlaps the operation's planned dates.
- **Sorumlu olduğum iş merkezleri** (Work centers I am responsible for) — only jobs of the work centers you are
  responsible for.

> **The plan, confirmation totals, remaining quantity and status come from the server; the screen does not calculate them.**
The operation's planned dates come from **Tarihleri Planla** (Schedule Dates),
[capacity planning](https://erpdocs.corexlogic.com/en/uretim/ekranlar/kapasite-planlama) or finite scheduling.

## Related

- [Operation confirmations](https://erpdocs.corexlogic.com/en/uretim/ekranlar/operasyon-teyitleri)
- [Enter an operation confirmation](https://erpdocs.corexlogic.com/en/uretim/islemler/operasyon-teyidi-girme)
- [Production orders](https://erpdocs.corexlogic.com/en/uretim/ekranlar/uretim-emirleri)