# Missing parts list

> Materials of released and in-production orders that cannot be covered from stock, in requirement date order, with expected supply.

URL: https://erpdocs.corexlogic.com/en/uretim/ekranlar/eksik-parca-listesi

Collects the material requirements of open orders that **cannot be covered from stock** in a single list. Stock is
allocated to orders **in requirement date order**: the order that starts earliest takes the stock first, and the
remaining shortage is written to the next order.

- **Type:** Screen
- **Module:** Manufacturing
- **Menu path:** Üretim › Üretim Yürütme › Eksik Parça Listesi (Production › Production Execution › Missing Parts List)
- **Screen route:** `/erp/manufacturing/missing-parts`
- **Required permission:** `erp-manufacturing-orders.view`

![Missing Parts List](https://erpdocs.corexlogic.com/en/en/img/screens/uretim/eksik-parca.png)
1. Requirement date
2. Missing = required − covered
3. Expected supply (purchase, sub-order)
4. Work center filter

| Column | Meaning |
|---|---|
| **İhtiyaç** (Requirement) | The requirement date; the list is allocated in this order. |
| **Üretim emri** (Production order) | Link to the order. |
| **Malzeme** (Material) | The component's code and name. |
| **Gereken** (Required) | The open (not yet consumed) quantity of the requirement. |
| **Karşılanan** (Covered) | The share allocated to this order from stock. |
| **Eksik** (Missing) | Required − covered. |
| **Birim** (Unit) | The unit of the requirement. |
| **Beklenen tedarik** (Expected supply) | Supply in transit (purchase order, sub-order) and its date; otherwise **Yok — talep açın** (None — open a requisition). If no unit conversion is defined, **Birim çevrimi tanımsız** (Unit conversion not defined). |

- Filters: **Ara** (Search) and **İş Merkezi** (Work Center). The list is calculated on the server and cached for a
  short time; **Yenile** (Refresh) reads it again.
- If nothing is missing, the screen shows "Eksik malzeme yok — açık emirlerin bütün gereksinimleri stokla
  karşılanıyor." (No missing material — all requirements of open orders are covered from stock.)
- The same information also appears in the order details: the **Malzeme** (Material) box ("1 kalem eksik" — 1 item
  missing) and the **Kullanılabilirlik** (Availability) column of the **Malzeme Gereksinimleri** (Material
  Requirements) tab ("Eksik 24,5 · Beklenen tedarik yok" — Missing 24.5 · No expected supply). If something is missing
  when the order is released, a notification appears: "Emir yayınlandı — 1 kalem eksik: HAM-0031 (24,5 KG). Eksik
  Parça Listesi" (Order released — 1 item missing: HAM-0031 (24.5 KG). Missing Parts List).

> **Example**
When **UE-2026-000003** (MAM-0006 Paslanmaz Depolama Tankı (stainless storage tank), 2.000 L) was released, 304.5 KG of
HAM-0031 304 sheet was required; stock was 280 KG → **24.5 KG missing**. The shortage is covered with a purchase
requisition or with **Malzeme Talebi** (Material Requisition) in the order details.

A shortage is a warning, not a block: the order is released; if stock is insufficient when consumption is posted, the
server rejects that line.

## Related

- [Production orders](https://erpdocs.corexlogic.com/en/uretim/ekranlar/uretim-emirleri)
- [Material requirements](https://erpdocs.corexlogic.com/en/uretim/ekranlar/malzeme-ihtiyaclari)
- [Post a material consumption](https://erpdocs.corexlogic.com/en/uretim/islemler/malzeme-sarfi-kaydetme)